BUILDING SAFETY INSPECTION

Structural / Electrical Certification

County recertification requires both a structural and an electrical certification. We do both, from one site visit.

OVERVIEW

What We Do

Building recertification in South Florida requires two separate certifications — structural and electrical — each signed and sealed by a licensed professional attesting that the building is safe for continued occupancy. Miami-Dade County and the municipalities administering Broward County's Building Safety Inspection Program both require them. Advanced Structural Solutions performs both, which means one engagement, one mobilisation, and one coordinated submission rather than two firms scheduling around each other.

Miami-Dade restructured its legacy 40-year program in June 2022. Coastal condominium and cooperative buildings within three miles of the coast that are three stories or taller now recertify at 25 years if built in 1998 or later, and buildings generally outside that coastal band recertify at 30 years if built in 1993 or later. Buildings built between 1983 and 1997 coastally, or 1983 and 1992 inland, were due by December 31, 2024. Recertification then recurs every 10 years. Single-family homes, duplexes, and buildings with an occupant load of 10 or fewer and 2,000 square feet or less are exempt.

Broward County operates a different program. The Building Safety Inspection Program is governed by Board of Rules and Appeals Policy 05-05 and administered by each municipality, so the operative trigger age and process vary by city — confirm yours with your local building department. Notices are typically mailed between June 1 and August 31, and the owner generally has 180 days from notice to submit a report signed by a Florida professional engineer or registered architect. Unlike the state milestone inspection, the Broward program reaches commercial buildings and is not limited to condominium or cooperative ownership.

On the electrical side, Miami-Dade requires infrared thermography on electrical systems operating at 400 amperes or greater, performed with approved equipment by a certified technician. Our engineers inspect main switchgear, distribution panels, grounding and bonding, emergency and standby power, and life safety systems. On the structural side, the county now explicitly requires evaluation of the foundation, load-carrying components, the façade holistically, exterior doors, and special features such as seawalls and retaining walls.

County recertification is the local requirement, and it sits alongside two separate state ones. Our guide to how county recertification compares with the state milestone inspection and the structural integrity reserve study explains which authority requires each, why satisfying one satisfies none of the others, and where the fieldwork overlaps enough to be combined into a single mobilisation.

You can see the result at Tierra del Mar in Boca Raton, Hilton Ft Lauderdale in Fort Lauderdale and Bayside Villages East in Fisher Island.

Regulatory content last verified against primary sources on .

Miami-Dade County’s building recertification programme requires infrared thermography on electrical systems operating at 400 amperes or greater, carried out by a certified technician. Advanced Structural Solutions performs that scan in-house.

Usama Tahir is a certified Level II Thermographer in electrical applications, trained by the Infrared Training Center, and a Professional Engineer licensed in Florida under number PE103610. Keeping the thermography in-house means the electrical certification runs on the same schedule as the structural inspection rather than waiting on a subcontractor’s availability.

Portrait of Usama Tahir

Electrical work led by

Usama Tahir, P.E.

Electrical Engineer

Florida Professional Engineer PE103610

OUR PROCESS

How We Deliver Results

01

Confirm Which Program Applies

Before any field work, we establish which obligations your building actually owes — state milestone inspection, county recertification, or both — and on what clocks. Getting this wrong costs either a missed deadline or an inspection you did not need.

02

Coordinated Structural and Electrical Inspection

Both inspections are performed on the same mobilisation. Structural covers the frame, slabs, columns, beams, balconies, parking structures, façade and foundation. Electrical covers switchgear, distribution, grounding, emergency power and life safety, including infrared thermography on systems at 400 amperes or greater where Miami-Dade requires it.

03

Certification on County Forms

Miami-Dade requires its own photo and report templates and rejects proprietary forms. We prepare the submission on the correct county templates, sealed by the licensed professional in responsible charge, and file it with the building department.

04

Deficiency Resolution

Where the building does not certify as-is, we document the deficiencies, scope the corrective work, and support the association through repair and re-inspection until certification is issued.

FAQ

Frequently Asked Questions

What is building recertification?

Building recertification is a county-level requirement that an aging building be certified as structurally and electrically safe for continued occupancy by a licensed engineer or architect, on a recurring schedule. It is administered locally, not by the state. Miami-Dade County runs its own program, restructured in June 2022 from the legacy 40-year program. Broward County operates the Building Safety Inspection Program under Board of Rules and Appeals Policy 05-05, administered by individual municipalities. Palm Beach County has no unified county program; municipalities such as Boca Raton adopted their own ordinances.

Is 40-year recertification still a thing in Miami-Dade?

The term persists but the schedule changed. Since June 2022, Miami-Dade recertifies coastal condominium and cooperative buildings within three miles of the coast that are three stories or taller at 25 years if built in 1998 or later, and buildings generally outside that coastal band at 30 years if built in 1993 or later, with recertification every 10 years after. Buildings built on or before 1982 that already went through the 40-year program continue on their existing 10-year schedule. If someone tells you your Miami-Dade building is on a 40-year clock, check the current schedule against your certificate of occupancy date.

Do we need both a structural and an electrical certification?

Yes. County recertification requires certification that the building is both structurally and electrically safe, and the two are separate professional attestations. Many associations engage two firms for this and end up coordinating between them — separate site visits, separate schedules, separate reports arriving at different times, and each firm pointing at the other when the building department has a question. Advanced Structural Solutions performs both under one contract, which removes the coordination burden and usually removes a duplicate mobilisation cost as well.

What is infrared thermography and why does Miami-Dade require it?

Infrared thermography is a non-contact inspection that images heat distribution across energised electrical equipment. Loose connections, overloaded conductors and failing components run hot before they fail, so thermography identifies problems that a visual inspection cannot see and that would otherwise progress to an arc fault or fire. Miami-Dade requires it on electrical systems operating at 400 amperes or greater, using approved equipment operated by a certified technician. The scan must be performed with the system energised and under load, which requires coordination with building operations.

How is the Broward program different from a milestone inspection?

The Broward Building Safety Inspection Program is a county program administered by each municipality, and it differs from the state milestone inspection in two ways that matter. First, it covers residential and commercial buildings alike and is not limited to condominium or cooperative ownership or to buildings of three or more habitable stories. Second, it runs on its own clock, so a Broward building can owe both a BSIP recertification and a state milestone inspection with different deadlines. Because each municipality administers the program itself, the operative trigger age varies — confirm yours with your city building department.

What happens if our building does not pass?

Recertification is not pass or fail in the way an exam is. The engineer certifies the building as safe, or documents the deficiencies that prevent certification. Where deficiencies exist, the association corrects them and the building is re-inspected. In Broward, repairs are generally due within 180 days of the report date, with extension letters valid for up to a further 180 days. Timelines and penalties are set locally, so they vary by jurisdiction. A building with serious unresolved deficiencies can face an unsafe structure determination, which is a materially different and more serious situation.

Can proprietary report forms be used?

Not in Miami-Dade. The county provides mandatory photo and report templates and rejects submissions on proprietary forms. This is a common and avoidable source of delay: a technically sound report filed on the wrong template gets returned, and the association loses weeks against a statutory clock. Confirm before engaging any firm that they prepare Miami-Dade submissions on current county templates. Other jurisdictions have their own submission requirements, which is a further reason to establish which program applies before field work begins.

How much notice will we get?

In Broward, notices are typically mailed between June 1 and August 31, and the owner generally has 180 days from notice to submit the certification report. Miami-Dade notifies property owners on its own recertification schedule. In both cases the notice period is shorter than it feels, because the association usually has to solicit proposals, select a firm, schedule field work around occupied units, allow time for report preparation, and absorb any building department review comments — all inside the same window. Associations that wait for the notice before starting the procurement process routinely need an extension.

Does our building owe recertification and a milestone inspection?

Possibly, and they are separate obligations on separate clocks. The milestone inspection is a state requirement under Statute 553.899 for condominium and cooperative buildings of three habitable stories or more. County recertification is local, and in Broward it reaches commercial buildings and buildings below three stories that the state requirement does not touch. A Broward condominium building can therefore owe a BSIP recertification, a state milestone inspection, and a structural integrity reserve study, with three different deadlines. Mapping all three at once is the first thing we do on any engagement.